پانی کے منصوبوں کی تصاویر
- پانی کےمنصوبے
- روزگار کے منصوبے
تصاویر
-
A total of four bore wells and hand pumps have been installed in the village of Mian Gujar in Peshawar after the flooding, to ensure a clean water supply following the contamination of existing wells.
-
Each hand pump has been installed in flood affectee's home. Preference was given to victims with children and victims with disabilities. Here a 60 foot 3 inch poor tube well with hand pump was installed for Noor Habib and family of Mian Gujar.
-
A 55 foot 3 inch bore tube well with hand pump was installed for Mr. Zamin Gul and family of Mian Gujar. Mr Gul is wheelchair bound with a family to support, so easy access to safe water was critical for him and his family.
-
A 62 foot 3 inch poor tube well with hand pump was installed for Mr. Jam Muhammed and family of Mian Gujar.
-
A 65 foot 3 inch poor tube well with hand pump was installed for Mr. Abdul Kamil and family of Mian Gujar.
-
A 20 inch 5micron/1 micron Carbon water filtration unit installed at Government Primary School, Fatoo Abdul Rahima located on Dila Zak Road, Kankola, Peshawar.
-
A 20 inch 5micron/1 micron Carbon water filtration unit installed at Hira School for Boys, located on Mian Gujar, Nahaqi, Peshawar.